ZEUSX_PDC_ Report_Booklet ISGUS GmbH Page 16/28 3.3 Target/Actual comparison report based on the target times of the work packages The report shows both the work package specific target time as previously defined and the actual PDC times. The difference (Diff.) is calculated based on these two values. For all three columns, namely Working package target, PDC time and Diff., the corresponding grand total is shown in the Total values line informing about the total target time, total actual time and the total difference. Project analysis with target/actual comparison