isgus_report_booklet_zeus_production_data_capture_en

ZEUSX_PDC_ Report_Booklet ISGUS GmbH Page 22/28 5.2 Comparison of 3 production lines Below evaluation table contains the figures resulting from a comparison of three different production lines (each production line is defined as a cost centre). Each row corresponds to a specific production line and contains the following data for the selected time range: recorded time values (MUT = Main usage time / PCT = Processing time), recorded quantity values (GY = Good yield / RJQ = Rejects qty. / RWQ = Rework qty. / PQ = Produced qty.) as well as the resulting key performance indicators such as the quality rate or the Overall Equipment Effectiveness (OEE) index. 5.3 Graphical comparison of daily values This graphical analysis is based on the daily values of three different production lines with reference to calendar week 13.